The infomal comments and views of the boat……..hey that’s what I am a boat!
[powered by WordPress.]
The refrigeration system is up and running, all major stuff is done except the new charger / inverter being installed to replace the old charger. That will take some time and prior planning. It will also require the installation of the four new internal and one new external DC switch panels. The wire will also have to be installed to support this branched system. The new main AC disconnect will have to be installed. Probably a shore / generator type switch.
Well she sails well, but helm wheel lock needs some clearing, it does not lock tight enough. The sails needed a couple of stitches prior to putting them up. The auto helm control head was returned to Ray Marine and found to be unrepairable, guess its time for another. Now it is time for bed, rocked asleep by the wind.Moored port side to, pier C, slip 21 in a standard fore and aft cross moor, with three port spring lines, taking power and water shore services from the pier.039 Deg 09′ 12.5″ North Latitude
076 Deg 29′ 59.4″ West Longitude
The Captain
[powered by WordPress.]
jour·nal n. A personal record of occurrences, experiences, and reflections kept on a regular basis; a diary.
Beneteau There is always something exceptional aboard a Beneteau.
— Beneteau USA
14 queries. 0.112 seconds